Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/26/2016 PERMIT SUB-TYPE: CNEW PERMIT NO: B16-3578
JOB ADDRESS:
6160 WARREN PKWY
FRISCO, TX 75034
DESC:   238646 SQ FT, CNEW / FRISCO STATION OFFICE 9-BUILDING
OWNER:
OFFICES 1 AT FRISCO STATION LP
C/O VANTRUST REAL ESTATE LLC
KANSAS CITY MO 64112-2634

CONTRACTOR:
JE DUNN CONSTRUCTION

DALLAS TX 75248
ISSUED DATE:
10/21/2016
APPLIED DATE:
8/5/2016
EXPIRED DATE:
11/17/2019
SITE APN:
ADD163422
STATUS:
COMPLETED
APPLICANT:
JE DUNN CONSTRUCTION

DALLAS TX 75248
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
26335526
FEE SUMMARY
INSPECTION SUMMARY
FIRE DEPT INSPECTION FEES$400.00
CREDIT CARD FEE$1.00
CREDIT CARD FEE$4.00
CREDIT CARD FEE$1.00
COMMERCIAL BUILDING PERMIT FEE$51,250.29
COMMERCIAL ELECTRIC FEE$9,667.84
MISCELLANEOUS PLUMBING FEES$21,715.14
MISCELLANOUS MECHANICAL FEES$12,077.30
SEWER IMPACT FEE$25,900.00
THOROUGHFARE IMPACT FEE$240,725.41
WATER IMPACT FEE$32,778.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$100.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
2 INCH COMPOUND METER$1,850.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
2 INCH COMPOUND METER$1,850.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$200.00
FIRE DEPT INSPECTION FEES$7,159.38
Total Fees:$407,979.36
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  UNDRGR FIRE MAIN HYD
______  PLUMBING ROUGH-IN
______  FIREINSULATION
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK HYDRO
______  FRAME/ELEC WALL
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  FRAME/ELEC WALL
______  ELECTRICAL ROUGH IN
______  UNDRGR FIRE MAIN FLU
______  MECHANICAL ROUGH
______  COMM FRAME
______  AUTOFIRE SPRK HYDRO
______  COMM PLUMB TOP OUT
______  AUTOFIRE SPRK HYDRO
______  CEILING
______  FRAME/ELEC WALL
______  COMM PLUMB TOP OUT
______  AUTOFIRE SPRK HYDRO
______  MECHANICAL ROUGH
______  CEILING
______  FRAME/ELEC WALL
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  COMM PLUMB TOP OUT
______  CEILING
______  CEILING
______  FRAME/ELEC WALL
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK HYDRO
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  CEILING
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  CEILING
______  FRAME/ELEC WALL
______  PLUMBING ROUGH-IN
______  FRAME/ELEC WALL
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  UNDRGR FIRE MAIN HYD
______  COMM PLUMB TOP OUT
______  METER PAYMENT
______  METER PAYMENT
______  SET 2" CMPND METER
______  SET 2" CMPND METER
______  FRAME/ELEC WALL
______  PLUMBING TOP OUT
______  COMM PLUMB TOP OUT
______  ELECTRICAL RELEASE
______  CEILING
______  COMM PLUMB TOP OUT
______  FRAME/ELEC WALL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  AUTOFIRE SPRK HYDRO
______  FIRE PUMP ACCEPT
______  CEILING
______  ELECTRICAL FINAL
______  FIRE FINAL
______  BUILDING FINAL
______  FIRE FINAL
______  FIRE FINAL
______  BUILDING FINAL
______  BUILDING FINAL
______  ACCESS CONTROL ACCEP
______  ACCESS CONTROL ACCEP
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)