|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/25/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-3229
|
JOB ADDRESS: 13080 COLETO CREEK DR FRISCO, TX |
DESC:
3506 AC, 4774 SF, SFR / 1 STORY |
|
OWNER:
CALATLANTIC HOMES
IRVING TX 75039
|
CONTRACTOR:
CALATLANTIC HOMES
IRVING TX 75039
|
ISSUED DATE: 8/29/2016
APPLIED DATE:7/14/2016
EXPIRED DATE:3/21/2018
SITE APN:D671958
STATUS:COMPLETED
|
|
APPLICANT:
CALATLANTIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 261582.66
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 09/30/2016 CB | $30.00 |
CAMERA 10/11/2016 CB | $30.00 |
UTILITY / ROW 06/06/2017 KB | $80.00 |
BUILDING PERMIT FEE | $1,803.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $143.22 |
SLAB 09/23/2016 CW | $30.00 |
2NDS/FRAMING 01/16/2017 DE | $30.00 |
DRY WALL 02/01/2017 DE | $30.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
CO/BUILDING FINAL 09/06/2017 JWE2 | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
PLUMBING ROUGH-IN 09/06/2016 PJ | $30.00 |
PLUMBING ROUGH-IN 09/06/2016 PJ | $30.00 |
GAS RELEASE 05/03/2017 SDC | $30.00 |
T-POLE 09/01/2016 WND | $30.00 |
Total Fees: | $6,663.97 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITIES INSPECTION |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|