|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/8/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-3040
|
JOB ADDRESS: 15115 ELDERFLOWER LN FRISCO, TX 75035 |
DESC:
4861 AC, 6119 SF, SFR / 2 STORY |
|
OWNER:
LENNAR HOMES
IRVING TX 75063
|
CONTRACTOR:
LENNAR HOMES
IRVING TX 75063
|
ISSUED DATE: 7/22/2016
APPLIED DATE:6/29/2016
EXPIRED DATE:10/11/2017
SITE APN:C2704843
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 362679.21
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BUILDING PERMIT FEE | $2,308.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $315.00 |
MISCELLANOUS MECHANICAL FEES | $179.00 |
RESIDENTIAL ELECTRIC FEE | $183.57 |
CREDIT CARD FEE | $3.60 |
CREDIT CARD FEE | $1.20 |
PLUMBTOPOUT/MECHRGH 12/19/2016 GU | $30.00 |
2NDS/FRAMING 01/23/2017 JDR | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
PLUMBTOPOUT/MECHRGH 01/13/2017 PJ | $30.00 |
PLUMBTOPOUT/MECHRGH 01/20/2017 PJ | $30.00 |
SLAB 09/27/2016 REED | $30.00 |
FLATWORK 09/28/2016 REED | $30.00 |
SLAB 09/28/2016 REED | $30.00 |
PLUMBTOPOUT/MECHRGH 12/28/2016 SDC | $30.00 |
THOROUGHFARE IMPACT FEE | $3,083.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
Total Fees: | $10,235.12 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|