Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/16/2016 PERMIT SUB-TYPE: SNEW PERMIT NO: B16-2630
JOB ADDRESS:
15227 MORNING STAR LN
FRISCO, TX 75035
DESC:   4473 AC, 5510 SF, SFR / 2 STORY
OWNER:
LENNAR HOMES

IRVING TX 75063

CONTRACTOR:
LENNAR HOMES

IRVING TX 75063
ISSUED DATE:
6/30/2016
APPLIED DATE:
6/1/2016
EXPIRED DATE:
11/18/2017
SITE APN:
C2704937
STATUS:
COMPLETED
APPLICANT:
LENNAR HOMES

IRVING TX 75063
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
333730.53
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$3.00
CREDIT CARD FEE$1.80
PLUMBTOPOUT/MECHRGH 12/19/2016 GU$30.00
BUILDING PERMIT FEE$2,163.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$280.00
MISCELLANOUS MECHANICAL FEES$179.00
RESIDENTIAL ELECTRIC FEE$165.30
2NDS/FRAMING 01/05/2017 JDR$30.00
2NDS/FRAMING 01/09/2017 JDR$30.00
DRY WALL 02/01/2017 JDR$30.00
T-POLE 08/08/2016 JWF$30.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$410.00
THOROUGHFARE IMPACT FEE$3,083.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
PLUMBTOPOUT/MECHRGH 11/17/2016 ZH$30.00
PLUMBTOPOUT/MECHRGH 12/07/2016 ZH$30.00
PLUMBTOPOUT/MECHRGH 12/16/2016 ZH$30.00
Total Fees:$10,036.85
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  CAMERA
______  FLATWORK
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  DRY WALL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)