|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/10/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-2551
|
JOB ADDRESS: 10409 BARTLETT DR FRISCO, TX 75035 |
DESC:
4166 AC, 4723 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 6/22/2016
APPLIED DATE:5/20/2016
EXPIRED DATE:8/21/2017
SITE APN:C2678857
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 310825.26
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
CAMERA 08/12/2016 CB | $30.00 |
UTILITY / ROW 01/25/2017 KB | $80.00 |
PLAN REVIEW FEE | $50.00 |
BUILDING PERMIT FEE | $2,048.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $249.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $141.69 |
CREDIT CARD FEE | $11.60 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
SLAB 08/10/2016 WBH | $30.00 |
SLAB 08/10/2016 WBH | $30.00 |
2NDS/FRAMING 10/10/2016 WND | $30.00 |
2NDS/FRAMING 10/12/2016 WND | $30.00 |
PLUMBTOPOUT/MECHRGH 10/05/2016 ZH | $30.00 |
Total Fees: | $3,937.04 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ WATER REGISTER |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|