|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/7/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-2402
|
JOB ADDRESS: 14182 SUSANA LN FRISCO, TX 75035 |
DESC:
2513 AC, 3096 SF, SFR / 2 STORY |
|
OWNER:
BEAZER HOMES
DALLAS TX 75234
|
CONTRACTOR:
BEAZER HOMES
DALLAS TX 75234
|
ISSUED DATE: 6/10/2016
APPLIED DATE:5/24/2016
EXPIRED DATE:5/20/2017
SITE APN:C2722334
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 187494.93
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
BUILDING PERMIT FEE | $1,433.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $228.00 |
MISCELLANOUS MECHANICAL FEES | $133.00 |
RESIDENTIAL ELECTRIC FEE | $92.88 |
WATER IMPACT FEE | $806.00 |
T-POLE 07/25/2016 WBH | $30.00 |
2NDS/FRAMING 09/01/2016 WBH | $30.00 |
Total Fees: | $3,283.63 |
|
|
| ______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ SHEATHING |
______ T-POLE |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ LATH |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|