|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/24/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-2259
|
JOB ADDRESS: 12778 TIMBER CROSSING DR FRISCO, TX |
DESC:
4006 AC, 5663 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 6/15/2016
APPLIED DATE:5/9/2016
EXPIRED DATE:2/3/2018
SITE APN:D672165
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 298887.66
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
GAS RELEASE 01/20/2017 CK | $30.00 |
2NDS/FRAMING 11/10/2016 CW | $30.00 |
ELECTRICAL FINAL 01/25/2017 DE | $30.00 |
BUILDING PERMIT FEE | $1,988.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $322.00 |
MISCELLANOUS MECHANICAL FEES | $192.00 |
RESIDENTIAL ELECTRIC FEE | $169.89 |
2NDS/FRAMING 11/14/2016 JWE2 | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
PLUMBTOPOUT/MECHRGH 10/26/2016 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 10/21/2016 PJ | $30.00 |
THOROUGHFARE IMPACT FEE | $4,378.00 |
WATER IMPACT FEE | $2,323.00 |
SEWER IMPACT FEE | $1,888.00 |
2NDS/FRAMING 11/15/2016 TXT | $30.00 |
SLAB 08/15/2016 WND | $30.00 |
PLUMBING ROUGH-IN 08/02/2016 ZH | $30.00 |
Total Fees: | $12,061.64 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ LATH |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|