|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/23/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-2237
|
JOB ADDRESS: 6283 FOREFRONT AVE FRISCO, TX |
DESC:
4799 AC, 5961 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES LTD
PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES LTD
PLANO TX 75093
|
ISSUED DATE: 6/10/2016
APPLIED DATE:5/9/2016
EXPIRED DATE:7/31/2017
SITE APN:D648189
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES LTD
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 358053.39
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 09/07/2016 CI | $30.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.80 |
PLUMBTOPOUT/MECHRGH 09/12/2016 GU | $30.00 |
THOROUGHFARE IMPACT FEE | $3,960.00 |
SEWER IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $100.00 |
GAS RELEASE 11/17/2016 CK | $30.00 |
T-POLE 06/20/2016 JDR | $30.00 |
RESIDENTIAL ELECTRIC FEE | $178.83 |
MISCELLANOUS MECHANICAL FEES | $185.50 |
MISCELLANEOUS PLUMBING FEES | $301.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,288.75 |
2NDS/FRAMING 11/28/2016 EW | $30.00 |
GAS RELEASE 11/30/2016 CK | $30.00 |
GAS RELEASE 11/28/2016 CK | $30.00 |
2NDS/FRAMING 09/14/2016 DE | $30.00 |
SHEATHING 09/07/2016 DE | $30.00 |
Total Fees: | $7,719.48 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ 2NDS/FRAMING |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|