|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/11/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-2015
|
JOB ADDRESS: 1289 ROUNDUP RD FRISCO, TX |
DESC:
4146 AC, 5073 SF, SFR / 2 STORY |
|
OWNER:
CALATLANTIC HOMES OF TEXAS INC
IRVINE CA 92618
|
CONTRACTOR:
CALATLANTIC HOMES
IRVING TX 75039
|
ISSUED DATE: 5/19/2016
APPLIED DATE:4/1/2016
EXPIRED DATE:6/27/2017
SITE APN:D677662
STATUS:COMPLETED
|
|
APPLICANT:
CALATLANTIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 309333.06
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 09/07/2016 CI | $30.00 |
BUILDING PERMIT FEE | $2,043.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $291.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL ELECTRIC FEE | $152.19 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
2NDS/FRAMING 09/22/2016 DE | $30.00 |
CREDIT CARD FEE | $0.60 |
FLATWORK 11/30/2016 EW | $30.00 |
PLUMBTOPOUT/MECHRGH 08/31/2016 GU | $30.00 |
SLAB 07/06/2016 JWE2 | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
PLUMBING ROUGH-IN 06/20/2016 ZH | $30.00 |
Total Fees: | $10,544.04 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|