|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/11/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-1976
|
JOB ADDRESS: 8470 HOWELL DR FRISCO, TX |
DESC:
2784 AC, 3482 SF, SFR / 2 STORY |
|
OWNER:
ARCADIA CGP 1 LLC
DALLAS TX 75219
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 5/13/2016
APPLIED DATE:4/27/2016
EXPIRED DATE:11/13/2017
SITE APN:D658954
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 207714.24
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 03/15/2017 ARG | $30.00 |
ELECTRICAL FINAL 03/20/2017 ARG | $30.00 |
SLAB 08/16/2016 DE | $30.00 |
SHEATHING 12/07/2016 DE | $30.00 |
SHEATHING 12/14/2016 DE | $30.00 |
SHEATHING 12/14/2016 DE | $30.00 |
CREDIT CARD FEE | $3.00 |
INSULATION 01/20/2017 EW | $30.00 |
PLUMBTOPOUT/MECHRGH 12/07/2016 GU | $30.00 |
BUILDING PERMIT FEE | $1,533.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $221.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL ELECTRIC FEE | $104.46 |
GAS RELEASE 03/01/2017 GU | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
Total Fees: | $2,801.71 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ DRY WALL |
______ GAS RELEASE |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|