Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/6/2016 PERMIT SUB-TYPE: SNEW PERMIT NO: B16-1940
JOB ADDRESS:
12097 GIDDINGS DR
FRISCO, TX 75035
DESC:   3370 AC, 3931 SF, SFR / 2 STORY
OWNER:
SUMEER HOMES INC

IRVING TX 75062-7011

CONTRACTOR:
SUMEER HOMES

IRVING TX 75062
ISSUED DATE:
5/19/2016
APPLIED DATE:
4/22/2016
EXPIRED DATE:
4/18/2018
SITE APN:
C2520040
STATUS:
COMPLETED
APPLICANT:
SUMEER HOMES

IRVING TX 75062
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
251435.7
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL FINAL 07/12/2017 ARG$30.00
ELECTRICAL FINAL 07/13/2017 ARG$30.00
CAMERA 07/22/2016 CB$30.00
CAMERA 12/22/2016 CB$30.00
CAMERA 01/17/2017 CB$30.00
UTILITIES INSPECTION 08/30/2017 CB$80.00
UTILITIES INSPECTION 10/06/2017 CB$80.00
2NDS/FRAMING 02/08/2017 CCM$30.00
BUILDING PERMIT FEE$1,753.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$256.00
MISCELLANOUS MECHANICAL FEES$146.00
RESIDENTIAL ELECTRIC FEE$117.93
CREDIT CARD FEE$1.80
CREDIT CARD FEE$1.80
CREDIT CARD FEE$2.60
CREDIT CARD FEE$1.60
CREDIT CARD FEE$11.60
2NDS/FRAMING 02/13/2017 MC$30.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$410.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
REPLACEMENT CARD FEE$10.00
PLUMBTOPOUT/MECHRGH 01/27/2017 MLM$30.00
GAS RELEASE 05/11/2017 MLM$30.00
PLUMBING ROUGH-IN 07/12/2016 SDC$30.00
GAS RELEASE 07/13/2017 SDC$30.00
Total Fees:$3,823.08
______  METER PAYMENT
______  T-POLE
______  PLUMBING ROUGH-IN
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  CAMERA
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  GAS RELEASE
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  SWROWINSP
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  WATER REGISTER
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)