|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/25/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-1737
|
JOB ADDRESS: 8483 CANAL ST FRISCO, TX |
DESC:
1726 AC, 2340 SF, SFR / 2 STORY |
|
OWNER:
CB JENI HOMES
PLANO TX 75093
|
CONTRACTOR:
CB JENI HOMES
PLANO TX 75093
|
ISSUED DATE: 4/28/2016
APPLIED DATE:4/8/2016
EXPIRED DATE:5/29/2017
SITE APN:D658932
STATUS:COMPLETED
|
|
APPLICANT:
CB JENI HOMES
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 128776.86
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.60 |
BUILDING PERMIT FEE | $1,138.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $205.00 |
MISCELLANOUS MECHANICAL FEES | $113.00 |
RESIDENTIAL ELECTRIC FEE | $70.20 |
UTILITY / ROW 11/28/2016 KB | $80.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
GAS RELEASE 11/03/2016 MLM | $30.00 |
GAS RELEASE 11/11/2016 MLM | $30.00 |
GAS RELEASE 11/15/2016 MLM | $30.00 |
FIRE DEPT INSPECTION FEES | $70.20 |
Total Fees: | $2,300.55 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ FIREINSULATION |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|