APPROVED DATE: 4/7/2016 PERMIT SUB-TYPE: SNEW PERMIT NO: B16-1510
JOB ADDRESS:
4375 LONGWOOD DR
FRISCO, TX
DESC:   5094 AC, 6628 SF, SFR / 2 STORY
OWNER:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034

CONTRACTOR:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
ISSUED DATE:
4/12/2016
APPLIED DATE:
3/28/2016
EXPIRED DATE:
8/14/2017
SITE APN:
D672262
STATUS:
COMPLETED
APPLICANT:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
380063.34
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 05/05/2016 JSB$80.00
CAMERA 07/11/2016 CB$30.00
CREDIT CARD FEE$0.60
BUILDING PERMIT FEE$2,398.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$308.00
MISCELLANOUS MECHANICAL FEES$185.50
RESIDENTIAL ELECTRIC FEE$198.84
SLAB 07/07/2016 JCF$30.00
SHEATHING 09/07/2016 JDR$30.00
2NDS/FRAMING 09/27/2016 JDR$30.00
UTILITY / ROW 01/19/2017 KB$80.00
THOROUGHFARE IMPACT FEE$4,378.00
WATER IMPACT FEE$2,323.00
SEWER IMPACT FEE$1,888.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$410.00
PLUMBTOPOUT/MECHRGH 09/16/2016 PJ$10.00
PLUMBTOPOUT/MECHRGH 09/16/2016 PJ$20.00
PLUMBING ROUGH-IN 06/21/2016 SDC$30.00
SHEATHING 08/31/2016 WND$30.00
Total Fees:$12,580.69
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  T-POLE
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)