Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/7/2016 PERMIT SUB-TYPE: SCHL PERMIT NO: B16-1252
JOB ADDRESS:
11222 MAMMOTH CAVE LN
FRISCO, 75035
DESC:   84128 SQ FT, SCHL / CARLOS LISCANO ELEMENTARY
OWNER:
FRISCO INDEPENDENT SCHOOL DIST

FRISCO TX 75035-7002

CONTRACTOR:
RATCLIFF CONSTRUCTORS

ADDISON TX 75001
ISSUED DATE:
6/14/2016
APPLIED DATE:
3/17/2016
EXPIRED DATE:
2/27/2018
SITE APN:
C2720395
STATUS:
COMPLETED
APPLICANT:
CORGAN ASSOCIATES INC

FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
16000000
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT COMMERCIAL$1,100.00
4 INCH COMP METER$3,000.00
SEWER IMPACT FEE$0.00
WATER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$0.00
COMMERCIAL BUILDING PERMIT FEE$31,717.14
COMMERCIAL ELECTRIC FEE$3,395.12
MISCELLANEOUS PLUMBING FEES$7,601.52
MISCELLANOUS MECHANICAL FEES$4,236.40
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$400.00
CREDIT CARD FEE$8.00
FIRE DEPT INSPECTION FEES$2,573.84
FIRE DEPT INSPECTION FEES$75.00
Total Fees:$54,157.02
______  PIER
______  PIER
______  PIER
______  PIER
______  PIER
______  PIER
______  PLUMBING ROUGH-IN
______  PIER
______  PLUMBING ROUGH-IN
______  PIER
______  ELECTRICAL ROUGH IN
______  PIER
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  SLAB
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  SLAB
______  PLUMBING ROUGH-IN
______  UNDRGR FIRE MAIN VIS
______  SLAB
______  CAMERA
______  METER PAYMENT
______  UNDRGR FIRE MAIN HYD
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FLATWORK
______  PLUMBING ROUGH-IN
______  GREASE TRAP
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  COMM SLAB
______  4 PD METER
______  UNDRGR FIRE MAIN FLU
______  MISC
______  SHEATHING
______  CMUWALL
______  MISC SLAB
______  COMM FRAME
______  COMM FRAME
______  PLUMBING ROUGH-IN
______  ELEC WALL
______  COMM FRAME
______  BRICK/WALL TIES
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  FRAME/ELEC WALL
______  BRICK/WALL TIES
______  PLUMBING ROUGH-IN
______  MECHANICAL ROUGH
______  FRAME/ELEC WALL
______  BRICK/WALL TIES
______  INSULATION
______  SHEATHING
______  COMM DRYWALL
______  MECHANICAL ROUGH
______  COMM DRYWALL
______  FRAME/ELEC WALL
______  PLUMBING ROUGH-IN
______  BRICK/WALL TIES
______  FLATWORK
______  FRAME/ELEC WALL
______  MECHANICAL ROUGH
______  BRICK/WALL TIES
______  FRAME/ELEC WALL
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  INSULATION
______  FLATWORK
______  COMM PLUMB TOP OUT
______  FRAME/ELEC WALL
______  BRICK/WALL TIES
______  COMM DRYWALL
______  SLAB
______  SLAB
______  FRAME/ELEC WALL
______  MECHANICAL ROUGH
______  ELECTRICAL RELEASE
______  MECHANICAL ROUGH
______  FLATWORK
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK VISUAL
______  FLATWORK
______  MECHANICAL ROUGH
______  CEILING
______  MECHANICAL ROUGH
______  PLUMBING ROUGH-IN
______  CEILING
______  FLATWORK
______  GAS RELEASE
______  AUTOFIRE SPRK HYDRO
______  FLATWORK
______  AUTOFIRE SPRK HYDRO
______  FLATWORK
______  PLUMBING ROUGH-IN
______  MECHANICAL ROUGH
______  FLATWORK
______  CEILING
______  ELECTRICAL ROUGH IN
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  LANDSCAPE
______  HEALTH FINAL
______  FIRE FINAL
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)