|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/10/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-0977
|
JOB ADDRESS: 8598 HOWELL DR FRISCO, TX |
DESC:
3251 AC, 4305 SF, SFR / 1 STORY |
|
OWNER:
CAMBRIDGE HOMES HOLDINGS, LLC
PLANO TX 75024
|
CONTRACTOR:
CAMBRIDGE HOMES HOLDINGS, LLC
PLANO TX 75024
|
ISSUED DATE: 3/14/2016
APPLIED DATE:2/25/2016
EXPIRED DATE:4/1/2017
SITE APN:D658879
STATUS:COMPLETED
|
|
APPLICANT:
CAMBRIDGE HOMES HOLDINGS, LLC
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 242557.11
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 07/12/2016 DE | $30.00 |
CREDIT CARD FEE | $0.60 |
BUILDING PERMIT FEE | $1,708.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
RESIDENTIAL ELECTRIC FEE | $129.15 |
ELECTRICAL FINAL 08/29/2016 JDR | $30.00 |
CREDIT CARD FEE | $0.60 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
Total Fees: | $2,844.60 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PIER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ SHEATHING |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|