Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/7/2016 PERMIT SUB-TYPE: SNEW PERMIT NO: B16-0947
JOB ADDRESS:
6532 HONEYWOOD LN
FRISCO, TX
DESC:   3582 AC, 4538 SF, SFR / 2 STORY
OWNER:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100
Frisco TX 75034

CONTRACTOR:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100
Frisco TX 75034
ISSUED DATE:
3/22/2016
APPLIED DATE:
2/23/2016
EXPIRED DATE:
5/16/2017
SITE APN:
D674376
STATUS:
COMPLETED
APPLICANT:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100
Frisco TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
267253.02
FEE SUMMARY
INSPECTION SUMMARY
BUILDING PERMIT FEE$1,833.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$270.00
MISCELLANOUS MECHANICAL FEES$146.00
RESIDENTIAL ELECTRIC FEE$136.14
FLATWORK 09/28/2016 DE$30.00
CREDIT CARD FEE$1.20
CREDIT CARD FEE$0.60
WATER METER DEPOSIT$100.00
1 INCH PD METER$410.00
PLUMBMECHFINAL 11/02/2016 SDC$30.00
PLUMBING ROUGH-IN 04/13/2016 SDC$30.00
SEWER IMPACT FEE$0.00
WATER IMPACT FEE$1,772.00
THOROUGHFARE IMPACT FEE$3,816.00
Total Fees:$8,595.69
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  INSULATION
______  LATH
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)