Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/26/2016 PERMIT SUB-TYPE: SNEW PERMIT NO: B16-0777
JOB ADDRESS:
15196 ELDERFLOWER LN
FRISCO, TX 75035
DESC:   5043 AC, 6270 SF, SFR / 2 STORY
OWNER:
SHADDOCK HOMES LTD

PLANO TX 75093

CONTRACTOR:
SHADDOCK HOMES LTD

PLANO TX 75093
ISSUED DATE:
3/7/2016
APPLIED DATE:
2/16/2016
EXPIRED DATE:
1/21/2017
SITE APN:
C2704894
STATUS:
COMPLETED
APPLICANT:
SHADDOCK HOMES LTD

PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
376258.23
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$1.80
CREDIT CARD FEE$2.40
CREDIT CARD FEE$1.80
CREDIT CARD FEE$7.00
CREDIT CARD FEE$3.20
CREDIT CARD FEE$2.20
CREDIT CARD FEE$0.60
ELECTRICAL FINAL 07/05/2016 GLQ$30.00
PLUMBMECHFINAL 07/19/2016 GU$30.00
REPLACE READABLE REGISTER$270.00
BUILDING PERMIT FEE$2,378.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$336.00
MISCELLANOUS MECHANICAL FEES$192.00
RESIDENTIAL ELECTRIC FEE$188.10
INSULATION 05/20/2016 JWF$30.00
FLATWORK 06/23/2016 JWF$30.00
ELECTRICAL FINAL 07/06/2016 JWF$30.00
UTILITY / ROW 07/11/2016 KB$80.00
UTILITY / ROW 07/13/2016 KB$80.00
UTILITY / ROW 07/18/2016 KB$80.00
THOROUGHFARE IMPACT FEE$3,083.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
PLUMBTOPOUT/MECHRGH 05/13/2016 MC$30.00
2NDS/FRAMING 05/17/2016 MC$30.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$410.00
GAS RELEASE 07/05/2016 MLM$30.00
PLUMBMECHFINAL 07/18/2016 MLM$30.00
PLUMBING ROUGH-IN 03/28/2016 PJ$30.00
PLUMBING ROUGH-IN 03/29/2016 PJ$30.00
UTILITY / ROW 07/15/2016 CB$80.00
BRICK/WALL TIES 05/25/2016 WBH$30.00
Total Fees:$11,067.85
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  INSULATION
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  WATER REGISTER
______  UTILITY / ROW
______  UTILITY / ROW
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)