|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/18/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-0688
|
JOB ADDRESS: 12722 TIMBER CROSSING DR FRISCO, TX |
DESC:
4507 AC, 5579 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 3/10/2016
APPLIED DATE:2/9/2016
EXPIRED DATE:6/7/2017
SITE APN:D672167
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 336267.27
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
INSULATION 07/29/2016 ARG | $30.00 |
PLUMBMECHFINAL 11/17/2016 CI | $30.00 |
BUILDING PERMIT FEE | $2,178.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $312.00 |
MISCELLANOUS MECHANICAL FEES | $159.00 |
RESIDENTIAL ELECTRIC FEE | $167.37 |
CREDIT CARD FEE | $3.00 |
PLUMBTOPOUT/MECHRGH 07/05/2016 GU | $30.00 |
SHEATHING 07/05/2016 JCF | $30.00 |
2NDS/FRAMING 07/19/2016 JCF | $0.00 |
ELECTRICAL FINAL 09/29/2016 JDR | $30.00 |
THOROUGHFARE IMPACT FEE | $4,378.00 |
WATER IMPACT FEE | $2,323.00 |
SEWER IMPACT FEE | $1,888.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
GAS RELEASE 09/29/2016 PJ | $30.00 |
FLATWORK 08/29/2016 WND | $30.00 |
PLUMBTOPOUT/MECHRGH 07/13/2016 ZH | $30.00 |
Total Fees: | $12,179.12 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ T-POLE |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|