|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/5/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-05667
|
JOB ADDRESS: 6577 HONEYWOOD LN FRISCO, TX |
DESC:
3275 AC, 4033 SF, SFR / 2 STORY |
|
OWNER:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
CONTRACTOR:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
ISSUED DATE: 1/17/2017
APPLIED DATE:12/13/2016
EXPIRED DATE:2/26/2018
SITE APN:D674392
STATUS:COMPLETED
|
|
APPLICANT:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 244347.75
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
UTILITY / ROW 06/27/2017 KB | $80.00 |
BUILDING PERMIT FEE | $1,718.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $277.00 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
RESIDENTIAL ELECTRIC FEE | $120.99 |
CREDIT CARD FEE | $7.00 |
CREDIT CARD FEE | $7.00 |
CREDIT CARD FEE | $0.60 |
PLUMBMECHFINAL 07/18/2017 GU | $30.00 |
1 INCH CURBSTOP REPAIR / REPLACE | $320.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
REPLACE READABLE REGISTER | $270.00 |
PLUMBTOPOUT/MECHRGH 04/03/2017 SDC | $30.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $0.00 |
Total Fees: | $9,131.84 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBMECHFINAL |
______ SHEATHING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|