|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/9/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-05477
|
JOB ADDRESS: 12378 BRIDGEPORT DR FRISCO, TX 75035 |
DESC:
4115 AC, 4727 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
ISSUED DATE: 2/13/2017
APPLIED DATE:11/29/2016
EXPIRED DATE:2/12/2018
SITE APN:C2727856
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 307020.15
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 02/22/2017 JSB | $80.00 |
UTILITIES INSPECTION 08/04/2017 CB | $80.00 |
T-POLE 02/17/2017 CCM | $30.00 |
BUILDING PERMIT FEE | $2,033.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL ELECTRIC FEE | $141.81 |
PLAN REVIEW FEE | $50.00 |
SLAB 03/07/2017 DE | $30.00 |
2NDS/FRAMING 04/10/2017 DE | $30.00 |
BRICK/WALL TIES 04/25/2017 DE | $30.00 |
BRICK/WALL TIES 04/26/2017 DE | $30.00 |
DRY WALL 04/27/2017 DE | $30.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $7.60 |
ELECTRICAL FINAL 06/23/2017 EW | $30.00 |
PLUMBING ROUGH-IN 02/24/2017 JWE2 | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
REPLACE READABLE REGISTER | $270.00 |
PLUMBMECHFINAL 07/28/2017 SDC | $30.00 |
PLUMBMECHFINAL 08/04/2017 SDC | $30.00 |
Total Fees: | $10,566.66 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ CAMERA |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ DRY WALL |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ SWROWINSP |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ SWROWINSP |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ SWROWINSP |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|