|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/28/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-05471
|
JOB ADDRESS: 12345 PHANTOM SPRINGS DR FRISCO, TX |
DESC:
6454 AC, 8677 SF, SFR / 2 STORY |
|
OWNER:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
CONTRACTOR:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
ISSUED DATE: 1/18/2017
APPLIED DATE:11/23/2016
EXPIRED DATE:12/11/2018
SITE APN:D672268
STATUS:COMPLETED
|
|
APPLICANT:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 450793.62
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SHEATHING 06/02/2017 ARG | $30.00 |
SHEATHING 06/13/2017 ARG | $30.00 |
2NDS/FRAMING 06/20/2017 ARG | $30.00 |
2NDS/FRAMING 06/22/2017 ARG | $30.00 |
2NDS/FRAMING 06/27/2017 ARG | $30.00 |
PLUMBING ROUGH-IN 02/13/2017 CK | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
UTILITIES INSPECTION 05/04/2018 CB | $80.00 |
FIRE DEPT INSPECTION FEES | $260.31 |
PLUMBTOPOUT/MECHRGH 06/15/2017 SDC | $30.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
REPLACEMENT CARD FEE | $10.00 |
PLUMBMECHFINAL 04/10/2018 ARG | $30.00 |
CREDIT CARD FEE | $11.03 |
MISCELLANOUS MECHANICAL FEES | $37.50 |
PLAN REVIEW FEE | $50.00 |
MISCELLANEOUS ELECTRICAL FEES | $12.36 |
MISCELLANEOUS BUILDING PERMIT FEES | $451.85 |
RESIDENTIAL ELECTRIC FEE | $247.95 |
MISCELLANOUS MECHANICAL FEES | $185.00 |
MISCELLANEOUS PLUMBING FEES | $364.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,748.75 |
SEWER IMPACT FEE | $1,888.00 |
WATER IMPACT FEE | $2,323.00 |
THOROUGHFARE IMPACT FEE | $4,378.00 |
Total Fees: | $14,334.15 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ AUTOFIRE SPRK HYDRO |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ LATH |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ GAS RELEASE |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|