Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/27/2016 PERMIT SUB-TYPE: SNEW PERMIT NO: B16-0252
JOB ADDRESS:
10521 TORINO DR
FRISCO, TX 75035
DESC:   3830 AC, 4669 SF, SFR / 2 STORY
OWNER:
DR HORTON

ROWLETT TX 75088

CONTRACTOR:
DR HORTON

ROWLETT TX 75088
ISSUED DATE:
2/2/2016
APPLIED DATE:
1/13/2016
EXPIRED DATE:
9/26/2017
SITE APN:
C2714878
STATUS:
COMPLETED
APPLICANT:
DR HORTON

ROWLETT TX 75088
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
285756.3
FEE SUMMARY
INSPECTION SUMMARY
UTILITY / ROW 03/27/2017 KB$80.00
DRY WALL 11/04/2016 CCM$30.00
BUILDING PERMIT FEE$1,923.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$263.00
MISCELLANOUS MECHANICAL FEES$146.00
RESIDENTIAL ELECTRIC FEE$140.07
REPLACEMENT CARD FEE$10.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$17.60
CREDIT CARD FEE$1.60
FLATWORK 02/23/2017 JDR$30.00
SHEATHING 06/20/2016 JWF$30.00
SHEATHING 06/27/2016 JWF$30.00
THOROUGHFARE IMPACT FEE$3,280.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
1 INCH CURBSTOP REPAIR / REPLACE$320.00
GAS RELEASE 02/21/2017 MLM$30.00
PLUMBING ROUGH-IN 03/22/2016 PJ$30.00
Total Fees:$10,775.42
______  METER PAYMENT
______  T-POLE
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  GAS RELEASE
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  GAS RELEASE
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  WATER REGISTER
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)