|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/22/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-0171
|
JOB ADDRESS: 13030 WOLF SNARE DR FRISCO, TX 75035 |
DESC:
4581 AC, 5586 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
15455 Dallas Parkway ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
15455 Dallas Parkway ADDISON TX 75001
|
ISSUED DATE: 1/29/2016
APPLIED DATE:1/11/2016
EXPIRED DATE:3/19/2017
SITE APN:C2706262
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
15455 Dallas Parkway ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 341788.41
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 02/19/2016 CB | $30.00 |
BUILDING PERMIT FEE | $2,203.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $298.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $167.58 |
BRICK/WALL TIES 07/26/2016 JWF | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 06/14/2016 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 06/16/2016 MLM | $30.00 |
2NDS/FRAMING 06/20/2016 REED | $30.00 |
GAS RELEASE 08/26/2016 SDC | $30.00 |
FLATWORK 07/05/2016 WBH | $30.00 |
DRY WALL 07/12/2016 WBH | $30.00 |
Total Fees: | $3,575.33 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ FLATWORK |
______ 2NDS/FRAMING |
______ FLATWORK |
______ 2NDS/FRAMING |
______ FLATWORK |
______ INSULATION |
______ FLATWORK |
______ FLATWORK |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|