|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/22/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-0162
|
JOB ADDRESS: 12875 CROSS POINT DR FRISCO, TX |
DESC:
4093 AC, 5169 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 2/1/2016
APPLIED DATE:1/11/2016
EXPIRED DATE:3/15/2017
SITE APN:D672243
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 305378.73
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 05/11/2016 ARG | $30.00 |
BUILDING PERMIT FEE | $2,023.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $329.00 |
MISCELLANOUS MECHANICAL FEES | $185.50 |
RESIDENTIAL ELECTRIC FEE | $155.07 |
THOROUGHFARE IMPACT FEE | $4,170.00 |
WATER IMPACT FEE | $2,212.00 |
SEWER IMPACT FEE | $1,798.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 04/14/2016 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 04/26/2016 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 05/02/2016 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 05/06/2016 PJ | $30.00 |
PLUMBTOPOUT/MECHRGH 05/10/2016 SDC | $30.00 |
2NDS/FRAMING 05/13/2016 WBH | $30.00 |
Total Fees: | $11,603.32 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|