|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/13/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-0079
|
JOB ADDRESS: 13257 COURTNEY DR FRISCO, TX 75033 |
DESC:
3096 AC, 3536 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
15455 Dallas Parkway ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
15455 Dallas Parkway ADDISON TX 75001
|
ISSUED DATE: 1/15/2016
APPLIED DATE:1/4/2016
EXPIRED DATE:6/14/2017
SITE APN:D619354
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
15455 Dallas Parkway ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 230992.56
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
GAS RELEASE 11/22/2016 CI | $30.00 |
PLUMBMECHFINAL 12/06/2016 CI | $30.00 |
BUILDING PERMIT FEE | $1,648.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $106.08 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $11.60 |
ILLEGAL JUMPER | $500.00 |
INSULATION 07/06/2016 JCF | $30.00 |
DRY WALL 07/12/2016 JCF | $30.00 |
BRICK/WALL TIES 08/01/2016 JCF | $30.00 |
BRICK/WALL TIES 08/02/2016 JCF | $30.00 |
ELECTRICAL FINAL 10/06/2016 JDR | $30.00 |
ELECTRICAL FINAL 10/28/2016 JDR | $30.00 |
UTILITY / ROW 12/12/2016 KB | $80.00 |
THOROUGHFARE IMPACT FEE | $858.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
PLUMBMECHFINAL 10/28/2016 PJ | $30.00 |
PLUMBTOPOUT/MECHRGH 05/04/2016 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 06/09/2016 SDC | $30.00 |
SLAB 01/29/2016 TGC | $30.00 |
SLAB 02/03/2016 TGC | $30.00 |
2NDS/FRAMING 06/23/2016 WBH | $30.00 |
BRICK/WALL TIES 08/04/2016 WND | $30.00 |
Total Fees: | $8,558.23 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ SLAB |
______ SLAB |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ MECHANICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ MECHANICAL FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ WATER REGISTER |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|