Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/29/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-5486
JOB ADDRESS:
2240 HIDALGO LN
FRISCO, TX
DESC:   4253 AC, 5086 SF, SFR / 2 STORY
OWNER:
GRAND HOMES
15455 Dallas Parkway
ADDISON TX 75001

CONTRACTOR:
GRAND HOMES
15455 Dallas Parkway
ADDISON TX 75001
ISSUED DATE:
1/8/2016
APPLIED DATE:
12/15/2015
EXPIRED DATE:
6/12/2017
SITE APN:
D637310
STATUS:
COMPLETED
APPLICANT:
GRAND HOMES
15455 Dallas Parkway
ADDISON TX 75001
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
317316.33
FEE SUMMARY
INSPECTION SUMMARY
CAMERA 02/11/2016 CB$30.00
PLUMBTOPOUT/MECHRGH 04/13/2016 CI$30.00
BUILDING PERMIT FEE$2,083.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$256.00
MISCELLANOUS MECHANICAL FEES$139.50
RESIDENTIAL ELECTRIC FEE$152.58
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$1,619.00
2NDS/FRAMING 05/05/2016 MC$30.00
Total Fees:$4,860.83
______  METER PAYMENT
______  T-POLE
______  LATH
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  ELECTRICAL ROUGH IN
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  LATH
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)