|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/28/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-5416
|
JOB ADDRESS: 12290 PHANTOM SPRINGS DR FRISCO, TX |
DESC:
6790 AC, 8874 SF, SFR / 2 STORY |
|
OWNER:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
CONTRACTOR:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
ISSUED DATE: 2/3/2016
APPLIED DATE:12/9/2015
EXPIRED DATE:6/27/2017
SITE APN:D672277
STATUS:COMPLETED
|
|
APPLICANT:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 506601.9
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 11/28/2016 CCM | $30.00 |
ELECTRICAL FINAL 11/30/2016 CCM | $30.00 |
GAS RELEASE 12/01/2016 CI | $30.00 |
BUILDING PERMIT FEE | $3,267.00 |
FENCE FEE | $20.00 |
MISCELLANEOUS ELECTRICAL FEES | $266.22 |
MISCELLANEOUS PLUMBING FEES | $340.00 |
MISCELLANOUS MECHANICAL FEES | $244.00 |
BRICK/WALL TIES 07/28/2016 DE | $30.00 |
CREDIT CARD FEE | $7.12 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $5.40 |
CREDIT CARD FEE | $2.20 |
2NDS/FRAMING 07/06/2016 JCF | $30.00 |
2NDS/FRAMING 07/11/2016 JCF | $30.00 |
FLATWORK 11/07/2016 JWE2 | $30.00 |
PLUMBMECHFINAL 12/21/2016 JWE2 | $30.00 |
2NDS/FRAMING 06/30/2016 JWF | $30.00 |
UTILITY / ROW 12/21/2016 KB | $80.00 |
CAMERA 03/25/2016 CB | $30.00 |
THOROUGHFARE IMPACT FEE | $4,170.00 |
WATER IMPACT FEE | $2,212.00 |
SEWER IMPACT FEE | $1,798.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
CREDIT CARD FEE | $10.00 |
REPLACE READABLE REGISTER | $270.00 |
FIRE DEPT INSPECTION FEES | $266.22 |
PLUMBTOPOUT/MECHRGH 06/15/2016 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 06/20/2016 SDC | $30.00 |
Total Fees: | $13,822.96 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ PIER |
______ PIER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ AUTOFIRE SPRK HYDRO |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ DRY WALL |
______ LATH |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ PLUMBMECHFINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|