|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/4/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-5351
|
JOB ADDRESS: 12955 CROSS POINT DR FRISCO, TX |
DESC:
4277 AC, 5286 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 1/12/2016
APPLIED DATE:12/8/2015
EXPIRED DATE:4/2/2017
SITE APN:D672180
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 284040.27
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 05/03/2016 ARG | $30.00 |
CAMERA 02/12/2016 CB | $30.00 |
SEWER IMPACT FEE | $1,798.00 |
THOROUGHFARE IMPACT FEE | $4,170.00 |
WATER IMPACT FEE | $2,212.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 04/22/2016 MLM | $30.00 |
PLUMBMECHFINAL 09/21/2016 PJ | $30.00 |
PLUMBMECHFINAL 09/26/2016 PJ | $30.00 |
PLUMBTOPOUT/MECHRGH 04/18/2016 SDC | $30.00 |
SLAB 02/08/2016 TGC | $30.00 |
2NDS/FRAMING 05/06/2016 WBH | $30.00 |
2NDS/FRAMING 05/17/2016 WBH | $30.00 |
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $1.20 |
MISCELLANEOUS BUILDING PERMIT FEES | $64.01 |
RESIDENTIAL ELECTRIC FEE | $152.58 |
MISCELLANOUS MECHANICAL FEES | $159.00 |
MISCELLANEOUS PLUMBING FEES | $277.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,918.75 |
Total Fees: | $11,592.54 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ LATH |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|