|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/29/2016
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B15-5284
|
JOB ADDRESS: 10150 LEGACY DR 200B FRISCO, TX |
DESC:
1412 SQ FT, CIFO / RICE POT FORMERLY WOK XPRESS |
|
OWNER:
JP LEGACY WYNDHAM COMMERICAL L
ALLEN TX 75013
|
CONTRACTOR:
YONG BING CHEN
GARLAND TX 75043
|
ISSUED DATE: 3/9/2016
APPLIED DATE:2/1/2016
EXPIRED DATE:5/2/2017
SITE APN:D650019
STATUS:COMPLETED
|
|
APPLICANT:
YONG BING CHEN
GARLAND TX 75043
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 45000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
COMMERCIAL BUILDING PERMIT FEE | $355.95 |
MISCELLANEOUS ELECTRICAL FEES | $86.48 |
MISCELLANEOUS PLUMBING FEES | $157.08 |
MISCELLANOUS MECHANICAL FEES | $100.60 |
SLAB 05/26/2016 CW | $35.00 |
COMM SLAB 05/27/2016 CW | $35.00 |
ELECTRICAL RELEASE 08/18/2016 CW | $35.00 |
CEILING 09/07/2016 CW | $35.00 |
CREDIT CARD FEE | $14.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
FIRE DEPT INSPECTION FEES | $75.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
PLUMBING FINAL 09/28/2016 PJ | $35.00 |
PLUMBING FINAL 09/29/2016 PJ | $30.00 |
PLUMBING ROUGH-IN 06/22/2016 SDC | $35.00 |
COMM PLUMB TOP OUT 06/28/2016 SDC | $35.00 |
PLUMBING TOP OUT 07/07/2016 ZH | $35.00 |
GAS PRESSURE 08/11/2016 ZH | $35.00 |
Total Fees: | $1,284.11 |
|
|
| ______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ SLAB |
______ COMM SLAB |
______ FLATWORK |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ COMM PLUMB TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ COMM FRAME |
______ BRICK/WALL TIES |
______ GAS PRESSURE |
______ ELECTRICAL RELEASE |
______ GAS RELEASE |
______ MECHANICAL ROUGH |
______ CEILING |
______ ELECTRICAL RELEASE |
______ CEILING |
______ CEILING |
______ MECHANICAL ROUGH |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL ROUGH |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ BRICK/WALL TIES |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ FIRE FINAL |
______ COURTESY HEALTH INSP |
______ HEALTH FINAL |
______ ELECTRICAL RELEASE |
______ COMM CO |
______ COMM CO |
______ COMM CO |
______ FIRE FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|