Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/4/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-5176
JOB ADDRESS:
3883 NEWMAN BLVD
FRISCO, TX 75033
DESC:   9525 AC, 12186SF, SFR / 2 STORY
OWNER:
PREMIER RENOVATIONS INC

DALLAS TX 75252

CONTRACTOR:
PREMIER RENOVATIONS INC

DALLAS TX 75252
ISSUED DATE:
2/1/2016
APPLIED DATE:
11/23/2015
EXPIRED DATE:
8/31/2020
SITE APN:
D613105
STATUS:
COMPLETED
APPLICANT:
PREMIER RENOVATIONS INC

DALLAS TX 75252
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
710660.25
FEE SUMMARY
INSPECTION SUMMARY
2NDS/FRAMING 05/31/2017 ARG$30.00
2NDS/FRAMING 06/26/2017 ARG$30.00
2NDS/FRAMING 06/28/2017 ARG$30.00
ELECTRICAL FINAL 09/17/2019 ARG$30.00
CAMERA 04/21/2017 CB$30.00
BUILDING PERMIT FEE$4,131.50
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$418.00
MISCELLANOUS MECHANICAL FEES$238.00
RESIDENTIAL ELECTRIC FEE$356.49
MISCELLANEOUS BUILDING PERMIT FEES$265.00
PLAN REVIEW FEE$50.00
SHEATHING 01/04/2017 DE$30.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$6.30
CREDIT CARD FEE$10.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$5.40
CREDIT CARD FEE$3.00
INSULATION 01/04/2018 JDR$30.00
ELECTRICAL FINAL 08/28/2019 JDW2$30.00
THOROUGHFARE IMPACT FEE$3,971.00
WATER IMPACT FEE$2,106.00
SEWER IMPACT FEE$1,712.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
CREDIT CARD FEE$10.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
REPLACE READABLE REGISTER$270.00
REPLACEMENT CARD FEE$10.00
FIRE DEPT INSPECTION FEES$356.49
ELECTRICAL FINAL 09/20/2019 RWT$30.00
PLUMBTOPOUT/MECHRGH 05/05/2017 SDC$30.00
PLUMBTOPOUT/MECHRGH 05/16/2017 SDC$30.00
ELECTRICAL FINAL 09/24/2019 VCS$30.00
ELECTRICAL FINAL 09/26/2019 VCS$30.00
Total Fees:$15,333.98
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB RES
______  CAMERA
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  AUTOFIRE SPRK HYDRO
______  CAMERA
______  CAMERA
______  CAMERA
______  PTO AND MECH ROUGH
______  WATER REGISTER
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  INSULATION RES
______  INSULATION RES
______  INSULATION RES
______  WATER REGISTER
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)