|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/4/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-5176
|
JOB ADDRESS: 3883 NEWMAN BLVD FRISCO, TX 75033 |
DESC:
9525 AC, 12186SF, SFR / 2 STORY |
|
OWNER:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
CONTRACTOR:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
ISSUED DATE: 2/1/2016
APPLIED DATE:11/23/2015
EXPIRED DATE:8/31/2020
SITE APN:D613105
STATUS:COMPLETED
|
|
APPLICANT:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 710660.25
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 05/31/2017 ARG | $30.00 |
2NDS/FRAMING 06/26/2017 ARG | $30.00 |
2NDS/FRAMING 06/28/2017 ARG | $30.00 |
ELECTRICAL FINAL 09/17/2019 ARG | $30.00 |
CAMERA 04/21/2017 CB | $30.00 |
BUILDING PERMIT FEE | $4,131.50 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $418.00 |
MISCELLANOUS MECHANICAL FEES | $238.00 |
RESIDENTIAL ELECTRIC FEE | $356.49 |
MISCELLANEOUS BUILDING PERMIT FEES | $265.00 |
PLAN REVIEW FEE | $50.00 |
SHEATHING 01/04/2017 DE | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $6.30 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $5.40 |
CREDIT CARD FEE | $3.00 |
INSULATION 01/04/2018 JDR | $30.00 |
ELECTRICAL FINAL 08/28/2019 JDW2 | $30.00 |
THOROUGHFARE IMPACT FEE | $3,971.00 |
WATER IMPACT FEE | $2,106.00 |
SEWER IMPACT FEE | $1,712.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
CREDIT CARD FEE | $10.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
REPLACE READABLE REGISTER | $270.00 |
REPLACEMENT CARD FEE | $10.00 |
FIRE DEPT INSPECTION FEES | $356.49 |
ELECTRICAL FINAL 09/20/2019 RWT | $30.00 |
PLUMBTOPOUT/MECHRGH 05/05/2017 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 05/16/2017 SDC | $30.00 |
ELECTRICAL FINAL 09/24/2019 VCS | $30.00 |
ELECTRICAL FINAL 09/26/2019 VCS | $30.00 |
Total Fees: | $15,333.98 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ AUTOFIRE SPRK HYDRO |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ PTO AND MECH ROUGH |
______ WATER REGISTER |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ WATER REGISTER |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|