|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/3/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-4779
|
JOB ADDRESS: 11444 LA SALLE RD FRISCO, TX |
DESC:
4828 AC, 5663 SF, SFR / 2 STORY |
|
OWNER:
BEAZER HOMES
DALLAS TX 75234
|
CONTRACTOR:
BEAZER HOMES
DALLAS TX 75234
|
ISSUED DATE: 11/9/2015
APPLIED DATE:10/26/2015
EXPIRED DATE:12/13/2016
SITE APN:C2722271
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 360217.08
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 04/15/2016 TGC | $30.00 |
ELECTRICAL FINAL 04/20/2016 ARG | $30.00 |
SET 1 PD METER 11/12/2015 ARG | $80.00 |
CAMERA 01/04/2016 CB | $30.00 |
BUILDING PERMIT FEE | $2,298.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $298.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $169.89 |
CREDIT CARD FEE | $0.60 |
SHEATHING 02/16/2016 EW | $30.00 |
2NDS/FRAMING 02/26/2016 EW | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
FLATWORK 04/22/2016 JDR | $30.00 |
UTILITY / ROW 05/13/2016 KB | $80.00 |
WATER IMPACT FEE | $806.00 |
2NDS/FRAMING 03/03/2016 MC | $30.00 |
PLUMBMECHFINAL 06/03/2016 MLM | $30.00 |
PLUMBING ROUGH-IN 12/18/2015 MRT | $30.00 |
PLUMBTOPOUT/MECHRGH 02/19/2016 PJ | $30.00 |
FLATWORK 04/25/2016 TGC | $30.00 |
Total Fees: | $4,729.24 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|