|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/4/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-4771
|
JOB ADDRESS: 11147 LAS CRUCES ST FRISCO, TX |
DESC:
3253 AC, 3971 SF, SFR / 2 STORY |
|
OWNER:
BEAZER HOMES
DALLAS TX 75234
|
CONTRACTOR:
BEAZER HOMES
DALLAS TX 75234
|
ISSUED DATE: 11/9/2015
APPLIED DATE:10/26/2015
EXPIRED DATE:12/27/2016
SITE APN:C2722145
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 242706.33
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BUILDING PERMIT FEE | $1,708.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL ELECTRIC FEE | $119.13 |
ELECTRICAL ROUGH IN 02/26/2016 CW | $30.00 |
ELECTRICAL ROUGH IN 02/19/2016 EW | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
WATER IMPACT FEE | $806.00 |
2NDS/FRAMING 03/03/2016 MC | $30.00 |
GAS RELEASE 05/16/2016 MLM | $30.00 |
2NDS/FRAMING 03/07/2016 TGC | $30.00 |
Total Fees: | $3,699.38 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|