|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/23/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-4702
|
JOB ADDRESS: 12570 RIVERHILL RD FRISCO, TX 75033 |
DESC:
3829 AC, 5206 SF, SFR / 1 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 11/9/2015
APPLIED DATE:10/20/2015
EXPIRED DATE:3/11/2017
SITE APN:D497774
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 285681.69
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.80 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
BUILDING PERMIT FEE | $1,923.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
RESIDENTIAL ELECTRIC FEE | $156.18 |
ELECTRICAL FINAL 07/08/2016 JCF | $30.00 |
THOROUGHFARE IMPACT FEE | $3,896.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
PLUMBTOPOUT/MECHRGH 03/03/2016 MLM | $30.00 |
2NDS/FRAMING 03/21/2016 REED | $30.00 |
SHEATHING 02/19/2016 TGC | $30.00 |
ELECTRICAL FINAL 06/09/2016 WBH | $30.00 |
ELECTRICAL FINAL 06/21/2016 WBH | $30.00 |
GAS RELEASE 07/08/2016 ZH | $30.00 |
GAS RELEASE 07/19/2016 ZH | $30.00 |
Total Fees: | $10,537.23 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ LATH |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|