Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/15/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-4551
JOB ADDRESS:
14351 STRAWFLOWERS DR
FRISCO, TX 75035
DESC:   3945 AC, 4734 SF, SFR / 2 STORY
OWNER:
DR HORTON

ROWLETT TX 75088

CONTRACTOR:
DR HORTON

ROWLETT TX 75088
ISSUED DATE:
10/27/2015
APPLIED DATE:
10/13/2015
EXPIRED DATE:
9/2/2017
SITE APN:
C2707286
STATUS:
COMPLETED
APPLICANT:
DR HORTON

ROWLETT TX 75088
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
294336.45
FEE SUMMARY
INSPECTION SUMMARY
PLUMBTOPOUT/MECHRGH 05/12/2016 CK$30.00
PLUMBTOPOUT/MECHRGH 05/25/2016 CK$30.00
PLUMBTOPOUT/MECHRGH 05/26/2016 CK$30.00
PLUMBTOPOUT/MECHRGH 06/09/2016 CK$30.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$2.40
CREDIT CARD FEE$2.40
CREDIT CARD FEE$10.00
SHEATHING 03/15/2016 EW$30.00
SHEATHING 03/16/2016 EW$30.00
BUILDING PERMIT FEE$1,972.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$270.00
MISCELLANOUS MECHANICAL FEES$152.50
RESIDENTIAL ELECTRIC FEE$142.02
SHEATHING 04/12/2016 EW$30.00
2NDS/FRAMING 06/20/2016 JWF$30.00
THOROUGHFARE IMPACT FEE$3,280.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
2NDS/FRAMING 07/12/2016 REED$30.00
DRY WALL 09/26/2016 REED$30.00
INSULATION 09/07/2016 WBH$30.00
INSULATION 09/07/2016 WBH$30.00
Total Fees:$10,605.47
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  DRY WALL
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK/WALL TIES
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  FLATWORK
______  PLUMBMECHFINAL
______  WATER REGISTER
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)