|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/19/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-4247
|
JOB ADDRESS: 11636 OLEANDER DR FRISCO, TX |
DESC:
4194 AC, 5147 SF , SFR / 2 STORY |
|
OWNER:
KINGSBRIDGE CONSTRUCTION LLC
ROCKWALL TX 75087
|
CONTRACTOR:
KINGSBRIDGE CONSTRUCTION LLC
ROCKWALL TX 75087
|
ISSUED DATE: 2/26/2016
APPLIED DATE:9/23/2015
EXPIRED DATE:6/27/2017
SITE APN:C2720715
STATUS:COMPLETED
|
|
APPLICANT:
KINGSBRIDGE CONSTRUCTION LLC
ROCKWALL TX 75087
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 312914.34
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 05/25/2016 CK | $30.00 |
RESIDENTIAL ELECTRIC FEE | $154.41 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
BUILDING PERMIT FEE | $2,058.75 |
FENCE FEE | $20.00 |
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $1.80 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
2NDS/FRAMING 06/06/2016 JWF | $30.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
WATER IMPACT FEE | $1,772.00 |
GAS RELEASE 10/06/2016 SDC | $30.00 |
GAS RELEASE 10/11/2016 SDC | $30.00 |
PLUMBMECHFINAL 11/08/2016 ZH | $30.00 |
Total Fees: | $10,031.96 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ PLUMBTOPOUT AND MECHRGH |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|