Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/14/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-3862
JOB ADDRESS:
3568 HARVEST GLEN DR
FRISCO, TX
DESC:   4903 AC, 5360 SF, SFR / 2 STORY
OWNER:
GRAND HOMES
15455 Dallas Parkway
ADDISON TX 75001

CONTRACTOR:
GRAND HOMES
15455 Dallas Parkway
ADDISON TX 75001
ISSUED DATE:
9/23/2015
APPLIED DATE:
8/24/2015
EXPIRED DATE:
12/26/2016
SITE APN:
D637353
STATUS:
COMPLETED
APPLICANT:
GRAND HOMES
15455 Dallas Parkway
ADDISON TX 75001
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
365812.83
FEE SUMMARY
INSPECTION SUMMARY
CAMERA 12/28/2015 CB$30.00
PLUMBTOPOUT/MECHRGH 02/19/2016 CI$30.00
PLUMBTOPOUT/MECHRGH 02/22/2016 CI$30.00
RESIDENTIAL ELECTRIC FEE$163.47
MISCELLANOUS MECHANICAL FEES$165.50
MISCELLANEOUS PLUMBING FEES$277.00
BUILDING PERMIT FEE$2,323.75
FENCE FEE$20.00
PLAN REVIEW FEE$50.00
PLUMBTOPOUT/MECHRGH 03/03/2016 GU$30.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$1,619.00
1 INCH PD METER$400.00
WATER METER DEPOSIT$100.00
PLUMBMECHFINAL 06/15/2016 PJ$30.00
2NDS/FRAMING 03/11/2016 RET$30.00
DRY WALL 03/24/2016 WBH$30.00
Total Fees:$5,328.72
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK/WALL TIES
______  GAS RELEASE
______  ELECTRICAL FINAL
______  LATH
______  FLATWORK
______  PLUMBMECHFINAL
______  CAMERA
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)