|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/11/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-3836
|
JOB ADDRESS: 13011 ALLENWOOD AVE FRISCO, TX 75035 |
DESC:
4279 AC, 5054 SF, SFR / 2 STORY |
|
OWNER:
K HOVNANIAN HOMES
Frisco TX 75035
|
CONTRACTOR:
K HOVNANIAN HOMES
Frisco TX 75035
|
ISSUED DATE: 9/22/2015
APPLIED DATE:8/21/2015
EXPIRED DATE:12/21/2016
SITE APN:C2721442
STATUS:COMPLETED
|
|
APPLICANT:
K HOVNANIAN HOMES
Frisco TX 75035
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 319256.19
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 11/09/2015 CI | $30.00 |
PLUMBING ROUGH-IN 11/10/2015 CI | $30.00 |
RESIDENTIAL ELECTRIC FEE | $151.53 |
MISCELLANOUS MECHANICAL FEES | $178.50 |
MISCELLANEOUS PLUMBING FEES | $305.00 |
BUILDING PERMIT FEE | $2,093.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $0.60 |
ELECTRICAL FINAL 04/22/2016 GLQ | $30.00 |
2NDS/FRAMING 01/29/2016 JCF | $30.00 |
THOROUGHFARE IMPACT FEE | $2,358.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
1 INCH PD METER | $400.00 |
WATER METER DEPOSIT | $100.00 |
PLUMBTOPOUT/MECHRGH 01/25/2016 SDC | $30.00 |
PLUMBMECHFINAL 06/15/2016 ZH | $30.00 |
Total Fees: | $9,178.38 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|