|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/3/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-3667
|
JOB ADDRESS: 13283 BELLINGHAM DR FRISCO, TX 75035 |
DESC:
2651 AC, 3563 SF, SFR / 2 STORY |
|
OWNER:
GEHAN HOMES LTD
15725 N. Dallas Pkwy DALLAS TX 75254
|
CONTRACTOR:
GEHAN HOMES LTD
15725 N. Dallas Pkwy DALLAS TX 75254
|
ISSUED DATE: 1/4/2016
APPLIED DATE:8/5/2015
EXPIRED DATE:11/19/2016
SITE APN:C2711959
STATUS:COMPLETED
|
|
APPLICANT:
GEHAN HOMES LTD
15725 N. Dallas Pkwy DALLAS TX 75254
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 155263.41
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
GAS RELEASE 04/26/2016 CK | $30.00 |
CREDIT CARD FEE | $0.60 |
SLAB 01/29/2016 EW | $30.00 |
FLATWORK 05/03/2016 MC | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBING ROUGH-IN 01/18/2016 PJ | $30.00 |
2NDS/FRAMING 03/15/2016 RET | $30.00 |
FLATWORK 04/29/2016 TGC | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,273.75 |
MISCELLANEOUS PLUMBING FEES | $214.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
MISCELLANEOUS BUILDING PERMIT FEES | $348.89 |
RESIDENTIAL ELECTRIC FEE | $106.89 |
Total Fees: | $2,783.63 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ LATH |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ ELECTRICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|