|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/7/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-3325
|
JOB ADDRESS: 11541 SANTA MARIA RD FRISCO, TX 75035 |
DESC:
3647 AC, 4505 SF, SFR / 2 STORY |
|
OWNER:
BEAZER HOMES
DALLAS TX 75234
|
CONTRACTOR:
BEAZER HOMES
DALLAS TX 75234
|
ISSUED DATE: 8/13/2015
APPLIED DATE:7/22/2015
EXPIRED DATE:9/4/2016
SITE APN:C2722227
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 272102.67
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 10/23/2015 CB | $30.00 |
MISCELLANEOUS ELECTRICAL FEES | $135.15 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
MISCELLANEOUS PLUMBING FEES | $284.00 |
BUILDING PERMIT FEE | $1,858.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 01/06/2016 EW | $30.00 |
INSULATION 01/11/2016 EW | $30.00 |
PLUMBTOPOUT/MECHRGH 12/22/2015 GU | $30.00 |
T-POLE 09/24/2015 JCF | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
WATER IMPACT FEE | $806.00 |
PLUMBTOPOUT/MECHRGH 12/28/2015 MRT | $30.00 |
GAS RELEASE 02/17/2016 PJ | $30.00 |
Total Fees: | $3,959.90 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|