|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/3/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-3101
|
JOB ADDRESS: 3635 BRIAR TREE LN FRISCO, TX |
DESC:
4385 AC, 5287 SF, SFR / 2 STORY |
|
OWNER:
BELCLAIRE HOMES
LEWISVILLE TX 75056
|
CONTRACTOR:
BELCLAIRE HOMES
LEWISVILLE TX 75056
|
ISSUED DATE: 8/4/2015
APPLIED DATE:7/7/2015
EXPIRED DATE:8/20/2016
SITE APN:D654824
STATUS:COMPLETED
|
|
APPLICANT:
BELCLAIRE HOMES
LEWISVILLE TX 75056
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 327164.85
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBMECHFINAL 02/11/2016 CI | $30.00 |
RESIDENTIAL ELECTRIC FEE | $158.61 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
MISCELLANEOUS PLUMBING FEES | $284.00 |
BUILDING PERMIT FEE | $2,133.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 09/30/2015 MLM | $30.00 |
ELECTRICAL FINAL 01/07/2016 REED | $30.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
Total Fees: | $10,545.86 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ LATH |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|