Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/17/2015 PERMIT SUB-TYPE: CNEW PERMIT NO: B15-3028
JOB ADDRESS:
6740 WINNING DR
FRISCO, TX
DESC:   14,818 SQ FT, CNEW / THE STAR BUILDING 5E SHELL
OWNER:
BLUE STAR FRISCO RETAIL LP

IRVING TX 75063-4999

CONTRACTOR:
MANHATTAN CONSTRUCTION CO

DALLAS TX 75206
ISSUED DATE:
11/16/2015
APPLIED DATE:
7/2/2015
EXPIRED DATE:
12/22/2018
SITE APN:
C2712517
STATUS:
COMPLETED
APPLICANT:
OBRIEN ARCHITECT

DALLAS TX 75230
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
1447900
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$1.00
CREDIT CARD FEE$9.89
FIRE DEPT INSPECTION FEES$50.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
2 INCH COMPOUND METER$1,850.00
SEWER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
MISCELLANEOUS ELECTRICAL FEES$609.16
MISCELLANOUS MECHANICAL FEES$96.25
MISCELLANEOUS PLUMBING FEES$338.00
COMMERCIAL BUILDING PERMIT FEE$4,211.97
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$494.54
Total Fees:$8,810.81
______  UNDRGR FIRE MAIN VIS
______  UNDRGR FIRE MAIN HYD
______  UNDRGR FIRE MAIN FLU
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  AUTOFIRE SPRK HYDRO
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  COMM FRAME
______  ELECTRICAL RELEASE
______  METER PAYMENT
______  SET 2" CMPND METER
______  BACKFLOW
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  AUTOFIRE ALARM
______  BUILDING FINAL
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)