|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/15/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-2870
|
JOB ADDRESS: 11779 ORANGE CT FRISCO, TX 75035 |
DESC:
3737 AC, 4309 SF, SFR / 2 STORY |
|
OWNER:
SUMEER HOMES
IRVING TX 75062
|
CONTRACTOR:
SUMEER HOMES
IRVING TX 75062
|
ISSUED DATE: 9/21/2015
APPLIED DATE:6/25/2015
EXPIRED DATE:11/29/2017
SITE APN:C2519641
STATUS:COMPLETED
|
|
APPLICANT:
SUMEER HOMES
IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 248973.57
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 06/13/2016 CB | $30.00 |
CAMERA 10/03/2016 CB | $30.00 |
CAMERA 10/05/2016 CB | $30.00 |
CAMERA 10/11/2016 CB | $30.00 |
UTILITY / ROW 05/12/2017 KB | $80.00 |
DRY WALL 01/26/2017 CCM | $30.00 |
RESIDENTIAL ELECTRIC FEE | $115.95 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
BUILDING PERMIT FEE | $1,738.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS BUILDING PERMIT FEES | $150.00 |
MISCELLANEOUS ELECTRICAL FEES | $13.32 |
MISCELLANEOUS PLUMBING FEES | $7.00 |
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.20 |
CREDIT CARD FEE | $0.60 |
CO/BUILDING FINAL 05/31/2017 EW | $30.00 |
T-POLE 10/06/2015 JCF | $30.00 |
SLAB 06/09/2016 JWF | $30.00 |
1 INCH PD METER | $400.00 |
WATER METER DEPOSIT | $100.00 |
PLUMBING ROUGH-IN 05/06/2016 MLM | $30.00 |
PLUMBING ROUGH-IN 05/12/2016 MLM | $30.00 |
PLUMBING ROUGH-IN 05/16/2016 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 11/21/2016 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 05/23/2017 SDC | $30.00 |
2NDS/FRAMING 12/08/2016 WND | $30.00 |
2NDS/FRAMING 12/20/2016 WND | $30.00 |
PLUMBTOPOUT/MECHRGH 10/14/2016 ZH | $30.00 |
PLUMBTOPOUT/MECHRGH 10/20/2016 ZH | $30.00 |
PLUMBTOPOUT/MECHRGH 10/27/2016 ZH | $30.00 |
Total Fees: | $3,635.82 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|