|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/21/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-2810
|
JOB ADDRESS: 3984 BROADMOOR WAY FRISCO, TX |
DESC:
2903 AC, 4199 SF, SFR / 1 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 8/20/2015
APPLIED DATE:6/24/2015
EXPIRED DATE:12/13/2016
SITE APN:D558300
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 216592.83
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 01/07/2016 CK | $30.00 |
RESIDENTIAL ELECTRIC FEE | $125.97 |
MISCELLANOUS MECHANICAL FEES | $133.00 |
MISCELLANEOUS PLUMBING FEES | $235.00 |
BUILDING PERMIT FEE | $1,578.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $1.40 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $2.80 |
SLAB 12/15/2015 EW | $35.00 |
SHEATHING 12/15/2015 EW | $35.00 |
SHEATHING 12/21/2015 EW | $30.00 |
UTILITY / ROW 06/01/2016 KB | $80.00 |
THOROUGHFARE IMPACT FEE | $3,869.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 12/21/2015 PJ | $30.00 |
FLATWORK 03/30/2016 REED | $30.00 |
FLATWORK 04/01/2016 REED | $30.00 |
ELECTRICAL FINAL 04/12/2016 REED | $30.00 |
T-POLE 09/01/2015 RRW | $30.00 |
PLUMBMECHFINAL 06/01/2016 SDC | $30.00 |
PLUMBMECHFINAL 06/07/2016 SDC | $30.00 |
2NDS/FRAMING 02/01/2016 TGC | $30.00 |
DRY WALL 02/24/2016 TGC | $30.00 |
PLUMBING ROUGH-IN 09/21/2015 MRT | $30.00 |
Total Fees: | $10,368.72 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SLAB |
______ SHEATHING |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|