|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/9/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-2601
|
JOB ADDRESS: 1215 POLO HEIGHTS DR FRISCO, TX 75033 |
DESC:
3545 AC, 4272 SF, SFR / 2 STORY |
|
OWNER:
SUMEER HOMES
IRVING TX 75062
|
CONTRACTOR:
SUMEER HOMES
IRVING TX 75062
|
ISSUED DATE: 7/16/2015
APPLIED DATE:6/12/2015
EXPIRED DATE:10/16/2017
SITE APN:D299512
STATUS:COMPLETED
|
|
APPLICANT:
SUMEER HOMES
IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 264492.45
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 07/30/2015 MXH | $80.00 |
CAMERA 08/18/2015 CB | $30.00 |
CAMERA 02/03/2016 CB | $30.00 |
CAMERA 02/10/2016 CB | $30.00 |
UTILITY / ROW 03/09/2017 KB | $80.00 |
RESIDENTIAL ELECTRIC FEE | $128.16 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
BUILDING PERMIT FEE | $1,818.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $11.60 |
PLUMBTOPOUT/MECHRGH 08/09/2016 GU | $30.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
2NDS/FRAMING 09/22/2016 JDR | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
PLUMBTOPOUT/MECHRGH 04/07/2016 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 09/15/2016 PJ | $30.00 |
PLUMBTOPOUT/MECHRGH 08/03/2016 ZH | $30.00 |
PLUMBTOPOUT/MECHRGH 08/05/2016 ZH | $30.00 |
Total Fees: | $4,338.11 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ WATER REGISTER |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|