Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/9/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-2601
JOB ADDRESS:
1215 POLO HEIGHTS DR
FRISCO, TX 75033
DESC:   3545 AC, 4272 SF, SFR / 2 STORY
OWNER:
SUMEER HOMES

IRVING TX 75062

CONTRACTOR:
SUMEER HOMES

IRVING TX 75062
ISSUED DATE:
7/16/2015
APPLIED DATE:
6/12/2015
EXPIRED DATE:
10/16/2017
SITE APN:
D299512
STATUS:
COMPLETED
APPLICANT:
SUMEER HOMES

IRVING TX 75062
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
264492.45
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 07/30/2015 MXH$80.00
CAMERA 08/18/2015 CB$30.00
CAMERA 02/03/2016 CB$30.00
CAMERA 02/10/2016 CB$30.00
UTILITY / ROW 03/09/2017 KB$80.00
RESIDENTIAL ELECTRIC FEE$128.16
MISCELLANOUS MECHANICAL FEES$146.00
MISCELLANEOUS PLUMBING FEES$270.00
BUILDING PERMIT FEE$1,818.75
FENCE FEE$20.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$2.40
CREDIT CARD FEE$0.60
CREDIT CARD FEE$10.00
CREDIT CARD FEE$11.60
PLUMBTOPOUT/MECHRGH 08/09/2016 GU$30.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
2NDS/FRAMING 09/22/2016 JDR$30.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
PLUMBTOPOUT/MECHRGH 04/07/2016 MLM$30.00
PLUMBTOPOUT/MECHRGH 09/15/2016 PJ$30.00
PLUMBTOPOUT/MECHRGH 08/03/2016 ZH$30.00
PLUMBTOPOUT/MECHRGH 08/05/2016 ZH$30.00
Total Fees:$4,338.11
______  METER PAYMENT
______  T-POLE
______  T-POLE
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  CAMERA
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  WATER REGISTER
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)