|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/2/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-2534
|
JOB ADDRESS: 14809 ROLLOVER PASS LN FRISCO, TX 75035 |
DESC:
4690 AC, 5686 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES LTD
PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES LTD
PLANO TX 75093
|
ISSUED DATE: 7/8/2015
APPLIED DATE:6/8/2015
EXPIRED DATE:6/12/2016
SITE APN:C2708407
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES LTD
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 349920.9
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 10/12/2015 CI | $30.00 |
RESIDENTIAL ELECTRIC FEE | $170.58 |
MISCELLANOUS MECHANICAL FEES | $179.00 |
MISCELLANEOUS PLUMBING FEES | $315.00 |
BUILDING PERMIT FEE | $2,243.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
FLATWORK 11/12/2015 JCF | $30.00 |
CO/BUILDING FINAL 12/11/2015 JCF | $30.00 |
SLAB 09/09/2015 JDR | $30.00 |
ELECTRICAL ROUGH IN 10/12/2015 JDR | $30.00 |
2NDS/FRAMING 10/14/2015 JDR | $30.00 |
INSULATION 10/20/2015 JDR | $30.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBING ROUGH-IN 08/14/2015 MLM | $30.00 |
GAS RELEASE 11/25/2015 MRT | $30.00 |
Total Fees: | $10,374.73 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|