BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/6/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-2483
|
JOB ADDRESS: 3920 NEWMAN BLVD FRISCO, TX 75033 |
DESC:
5878 AC, 8165 SF, SFR / 2 STORY |
|
OWNER:
PENNETT, BARRY & HOLLY
FRISCO TX 75033
|
CONTRACTOR:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
ISSUED DATE: 7/7/2015
APPLIED DATE:6/4/2015
EXPIRED DATE:8/1/2017
SITE APN:D613184
STATUS:COMPLETED
|
|
APPLICANT:
PREMIER RENOVATIONS INC
DALLAS TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 438557.58
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 02/25/2016 CK | $30.00 |
THOROUGHFARE IMPACT FEE | $3,971.00 |
WATER IMPACT FEE | $2,106.00 |
SEWER IMPACT FEE | $1,712.00 |
REPLACEMENT CARD FEE | $10.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
RESIDENTIAL ELECTRIC FEE | $244.95 |
MISCELLANOUS MECHANICAL FEES | $185.50 |
MISCELLANEOUS PLUMBING FEES | $308.00 |
BUILDING PERMIT FEE | $2,688.75 |
FENCE FEE | $20.00 |
T-POLE 07/10/2015 JCF | $30.00 |
PIER 07/16/2015 JCF | $30.00 |
ELECTRICAL FINAL 10/10/2016 JDR | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
1.5 INCH PD METER | $185.00 |
FIRE DEPT INSPECTION FEES | $244.95 |
2NDS/FRAMING 03/22/2016 REED | $30.00 |
SLAB 09/14/2015 RRW | $30.00 |
Total Fees: | $12,359.75 |
|
|
| ______ PIER |
______ T-POLE |
______ PIER |
______ T-POLE |
______ METER PAYMENT |
______ PIER |
______ PIER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ SHEATHING |
______ INSULATION |
______ AUTOFIRE SPRK HYDRO |
______ DRY WALL |
______ LATH |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|