|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/17/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-2339
|
JOB ADDRESS: 4284 CHEETAH TRL FRISCO, TX |
DESC:
4992 AC, 5738 SF, SFR / 2 STORY |
|
OWNER:
MERITAGE HOMES
IRVING TX 75038
|
CONTRACTOR:
MERITAGE HOMES
IRVING TX 75038
|
ISSUED DATE: 6/22/2015
APPLIED DATE:5/22/2015
EXPIRED DATE:9/20/2016
SITE APN:D655143
STATUS:COMPLETED
|
|
APPLICANT:
MERITAGE HOMES
IRVING TX 75038
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 372453.12
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $172.14 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
MISCELLANEOUS PLUMBING FEES | $291.00 |
BUILDING PERMIT FEE | $2,358.75 |
FENCE FEE | $20.00 |
SHEATHING 11/04/2015 CW | $30.00 |
ELECTRICAL ROUGH IN 11/19/2015 CW | $30.00 |
ELECTRICAL ROUGH IN 11/24/2015 CW | $30.00 |
2NDS/FRAMING 12/02/2015 CW | $30.00 |
2NDS/FRAMING 12/02/2015 CW | $30.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
FLATWORK 01/18/2016 JDR | $30.00 |
FLATWORK 01/21/2016 JDR | $30.00 |
UTILITY / ROW 03/17/2016 KB | $80.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 11/19/2015 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 11/30/2015 MLM | $30.00 |
Total Fees: | $11,044.89 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|