|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/15/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-2247
|
JOB ADDRESS: 15218 CRYSTAL BEACH LN FRISCO, TX 75035 |
DESC:
4212 AC, 5077 SF, SFR / 2 STORY |
|
OWNER:
LENNAR HOMES
IRVING TX 75063
|
CONTRACTOR:
LENNAR HOMES
IRVING TX 75063
|
ISSUED DATE: 7/1/2015
APPLIED DATE:5/19/2015
EXPIRED DATE:10/10/2016
SITE APN:C2704875
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 314257.32
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 08/20/2015 CB | $30.00 |
RESIDENTIAL ELECTRIC FEE | $126.36 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
MISCELLANEOUS PLUMBING FEES | $284.00 |
BUILDING PERMIT FEE | $2,068.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
ELECTRICAL FINAL 01/27/2016 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 10/16/2015 GU | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
2NDS/FRAMING 11/05/2015 JCF | $30.00 |
2NDS/FRAMING 11/09/2015 JCF | $30.00 |
DRY WALL 12/10/2015 JCF | $30.00 |
THOROUGHFARE IMPACT FEE | $3,083.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
PLUMBTOPOUT/MECHRGH 11/02/2015 MRT | $30.00 |
PLUMBTOPOUT/MECHRGH 10/28/2015 PJ | $30.00 |
T-POLE 08/05/2015 WBH | $30.00 |
Total Fees: | $9,901.01 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|