Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/29/2015 PERMIT SUB-TYPE: SNEW PERMIT NO: B15-1903
JOB ADDRESS:
11197 PATTISON DR
FRISCO, TX 75035
DESC:   4133 AC, 4949 SF, SFR / 2 STORY
OWNER:
DR HORTON
4306 Miller Rd.
ROWLETT TX 75088

CONTRACTOR:
DR HORTON
4306 Miller Rd.
ROWLETT TX 75088
ISSUED DATE:
6/9/2015
APPLIED DATE:
4/29/2015
EXPIRED DATE:
9/7/2016
SITE APN:
C2707254
STATUS:
COMPLETED
APPLICANT:
DR HORTON
4306 Miller Rd.
ROWLETT TX 75088
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
308363.13
FEE SUMMARY
INSPECTION SUMMARY
CAMERA 07/20/2015 CB$30.00
PLUMBTOPOUT/MECHRGH 09/18/2015 CI$30.00
PLUMBMECHFINAL 03/03/2016 CK$30.00
THOROUGHFARE IMPACT FEE$3,280.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$2.40
CREDIT CARD FEE$0.60
RESIDENTIAL ELECTRIC FEE$148.47
MISCELLANOUS MECHANICAL FEES$152.50
MISCELLANEOUS PLUMBING FEES$270.00
BUILDING PERMIT FEE$2,038.75
FENCE FEE$20.00
SLAB 07/16/2015 JDR$30.00
ELECTRICAL ROUGH IN 09/18/2015 JLM$30.00
SHEATHING 09/25/2015 JLM$30.00
2NDS/FRAMING 09/25/2015 JLM$30.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$400.00
ELECTRICAL FINAL 01/11/2016 RET$30.00
INSULATION 10/02/2015 WBH$30.00
Total Fees:$10,076.12
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FLATWORK
______  SLAB
______  SLAB
______  CAMERA
______  CAMERA
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  SHEATHING
______  2NDS/FRAMING
______  SHEATHING
______  INSULATION
______  PLUMBTOPOUT AND MECHRGH
______  INSULATION
______  SHEATHING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)