|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/19/2015
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B15-1775
|
JOB ADDRESS: 12855 GREENHAVEN DR FRISCO, TX 75035 |
DESC:
3575 AC, 4126 SF, SFR / 2 STORY |
|
OWNER:
SUMEER HOMES INC
IRVING TX 75062-7011
|
CONTRACTOR:
SUMEER HOMES
IRVING TX 75062
|
ISSUED DATE: 6/9/2015
APPLIED DATE:4/24/2015
EXPIRED DATE:4/9/2017
SITE APN:C2590206
STATUS:COMPLETED
|
|
APPLICANT:
SUMEER HOMES
IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 266730.75
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 08/18/2015 CB | $30.00 |
CAMERA 01/08/2016 CB | $30.00 |
RESIDENTIAL ELECTRIC FEE | $126.48 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
BUILDING PERMIT FEE | $1,828.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
FLATWORK 05/17/2016 JCF | $30.00 |
SLAB 08/10/2015 JDR | $30.00 |
SLAB 08/11/2015 JDR | $30.00 |
SLAB 08/12/2015 JDR | $30.00 |
SLAB 08/14/2015 JDR | $30.00 |
FLATWORK 05/18/2016 JWF | $30.00 |
ELECTRICAL FINAL 05/20/2016 JWF | $30.00 |
ELECTRICAL FINAL 06/08/2016 JWF | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $400.00 |
GAS RELEASE 06/08/2016 MLM | $30.00 |
GAS RELEASE 06/10/2016 MLM | $30.00 |
GAS RELEASE 07/01/2016 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 01/21/2016 PJ | $30.00 |
PLUMBMECHFINAL 08/17/2016 SDC | $30.00 |
Total Fees: | $3,344.23 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ SHEATHING |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|